The practical completion inspection is your last look before you pay the final claim and take the keys. Everything is checked against the contract, the NCC and the Victorian tolerances.

  • At practical completion, before you sign anything or hand over the final payment
  • 2 to 3 hours on site
  • Report within 24 hours
Get your Wollert inspection priceInstant price. No obligation. Same-week bookings.

Fully licensed & accredited

Stage7 of 7
When to bookAt practical completion, before you sign anything or hand over the final payment
Time on site2 to 3 hours on site
Inspected againstThe VBA Guide to Standards and Tolerances 2015, the NCC, your contract drawings and inclusions

What is included in a Wollert pre-handover (PCI) inspection

  • Every room: paint, plaster, cornices, doors, windows and floors
  • Wall and ceiling finish in natural light
  • Wet areas: tiling, grout, silicone, screens and drainage
  • Kitchen and laundry: cabinetry, benchtops and appliances installed
  • External: render, brickwork, cladding, caulking and paint
  • Roof, gutters, downpipes and stormwater connection
  • Roof space where safely accessible
  • Garage door, slab falls and driveway
  • Paths, porch, alfresco and step compliance
  • Site drainage, ponding and slab edge exposure
  • Fencing, gates, letterbox and clothesline where in contract
  • Contract inclusions and selections against what was built
  • Compliance certificates available for waterproofing, termite and glazing
  • A numbered, photographed defect list for the site supervisor
Why it matters here

Pre-handover (PCI) inspections on Wollert builds

A new Wollert home is handed over onto ground that will move through its first seasons, so the handover list matters for what it records as much as what it fixes. Establishing the condition of the slab, the brickwork and the internal finishes at handover gives you a clear baseline if cracking appears in year one.

What we find at this stage in Wollert

  • Paint finish patchy, with roller marks, misses and overspray on trims
  • Doors and windows not closing cleanly, or locks and catches not aligned
  • Chips and scratches to benchtops, baths, tiles, glass and door hardware
  • Site works incomplete, including driveway levels, gates and external paths
  • Gutters holding debris or water, and downpipes not connected to drainage
  • Contract items missing or substituted against the inclusions you signed for
Roof cappings fixed from the top instead of the sides, which invites water in, Wollert
Roof cappings fixed from the top instead of the sides, which invites water in
Noggings needed to pick up the plaster to most ceilings, Wollert
Noggings needed to pick up the plaster to most ceilings
Site not graded, so rainwater can run back and seep under the slab, Wollert
Site not graded, so rainwater can run back and seep under the slab
Sample findings

Sample defects found during our pre-handover (PCI) inspections in Wollert

Annotated findings from Pre-handover (PCI) inspections on Wollert builds. Client addresses withheld.

Metal roof dented or scratched, which can lead to early rusting, found during a practical completion inspection in Wollert
Metal roof dented or scratched, which can lead to early rusting
Anti-capillary breaks missing from the metal cappings and flashings, found during a practical completion inspection in Wollert
Anti-capillary breaks missing from the metal cappings and flashings
External glazed door fitted inside out, so the glass can be removed from outside, found during a practical completion inspection in Wollert
External glazed door fitted inside out, so the glass can be removed from outside
Toilet pan loose and not properly fixed to the floor, found during a practical completion inspection in Wollert
Toilet pan loose and not properly fixed to the floor
Cracked and chipped tiles that need replacing, found during a practical completion inspection in Wollert
Cracked and chipped tiles that need replacing

The other stages of a Wollert build

  1. Bored piers inspection in Wollert1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
  2. Slab pre-pour inspection in Wollert2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
  3. Frame inspection in Wollert3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
  4. Lock-up (pre-plaster) inspection in Wollert4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
  5. Fixing inspection in Wollert5FixingAfter plaster, doors and cabinetry, before the painter starts
  6. Waterproofing inspection in Wollert6WaterproofingAfter the waterproofer finishes and before a single tile is laid

All construction stage inspections in Wollert →

Guides

Construction stage guides for Wollert

All guides →

Book a pre-handover (pci) inspection in Wollert

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Pre-handover (PCI) inspections in Wollert: common questions

What is measured against at handover?

Your contract and selections first, then the NCC and the ABCB Housing Provisions, then the Guide to Standards and Tolerances 2015. That guide is the Victorian benchmark for finish, level, plumb and straightness.

Should I pay the final claim before items are fixed?

Take advice on your own contract before paying. Most domestic building contracts allow the final claim at practical completion, with defects attended to in the rectification period, so raise items in writing early.

How long does the builder have to fix the list?

That comes from your contract, which normally sets a defects liability or rectification period after handover. Report items in writing within that period and keep the correspondence, because dates matter later.

Is the PCI report usable at VCAT?

No. A handover report is written for you and your builder. VCAT needs an expert witness report prepared for that purpose, and we can prepare one separately if a matter goes that far.

What if the builder disputes the list?

Raise it with the builder in writing first. If it stays unresolved, the Building and Plumbing Commission runs a dispute resolution service, formerly DBDRV, and VCAT's Building and Property List comes after that.

Do you check the appliances and the power?

No. We do not test, operate or energise electrical work, gas appliances or cooktops. Those are for a licensed electrician or gasfitter. We do report visible damage and obvious incomplete work.