When to book each stage inspection on a Wollert build
How to time the pre-slab, frame, lock-up, waterproofing and fixing inspections on a new Wollert home so faults are found while work is open.
Fixing stage is when the house is lined out. Skirtings, architraves, doors, cabinets and tiling are in, and the paint has not yet gone on to cover the joinery work.
A house on reactive Wollert clay settles into its final shape over its first summer and winter. Joinery fitted with sloppy gaps or hard against a wall has nowhere to go when the frame moves, and that is when doors bind and cornices open. Careful fixing work is what keeps those movements out of sight.



Annotated findings from Fixing inspections on Wollert builds. Client addresses withheld.





1Bored piersOnce the holes are bored and the cages are in, before any concrete goes near them
2Slab pre-pourThe day before the pour, while the steel and pods are still exposed
3FrameOnce the trusses are up, before wrap, sarking or cladding hides anything
4Lock-up (pre-plaster)After roof, windows and brickwork, before the plasterer arrives
6WaterproofingAfter the waterproofer finishes and before a single tile is laid
7Pre-handover (PCI)At practical completion, before you sign anything or hand over the final payment
How to time the pre-slab, frame, lock-up, waterproofing and fixing inspections on a new Wollert home so faults are found while work is open.

Wollert sits on Newer Volcanics basalt with heavy reactive clay above it. What that means for slab design and your pre-slab check.

What to do in Victoria when a builder blocks your private stage inspector, including contract access, written notice and the BPC dispute pathway.
Instant online pricing, or talk to the booking team on 1300 471 805.
Paint hides the joinery. Once two coats are on, an open mitre or a poorly set plaster joint is far harder to prove and far messier to repair, because the repair then needs repainting as well.
Against the Guide to Standards and Tolerances 2015 in Victoria, together with the contract and your selections. That guide sets measurable limits for lipping, gaps, level and finish rather than leaving it to opinion.
Yes, by hand. We swing doors, open drawers and check margins and catches by operating them. We do not test appliances, cooktops or any electrical or gas fitting at any point.
No. Fixing comes before painting and before the final trades. Handover is the practical completion inspection at the end, and most owners book both because they catch very different things.
We can still inspect what is installed, and we will list what was not present on the day. If a large part of the fixing work is outstanding it is usually better to move the booking by a week.
Most items at fixing stage are straightforward for the trades still on site, which is exactly why the timing works. Anything not resolved carries forward into your practical completion list.